Interactive Lean and Agile Management Tool

Value Stream Mapping

Map value-added and non-value-added activities across an end-to-end workflow, expose waiting and WIP, calculate flow efficiency and design a Lean future state.

At a Glance
Level Foundation / Intermediate
Typical Duration 15–20 minutes
Learning Format Guided current-state and future-state mapping
Best For Lean teams, process owners and improvement practitioners
Overview

See the whole flow before improving individual activities.

Value Stream Mapping makes work, delay, queues and customer-value creation visible across an end-to-end process. In this demonstration, you will map a service workflow, classify value, expose WIP and waiting, calculate current-state flow metrics and test a future-state improvement.

Guided Demonstration

Value Stream Mapping — Step by Step

Eight locked stages move from the current-state context through activity sequencing, value classification, time and WIP, flow metrics, takt, a future-state challenge and management review.

Lead Time Not revealed
Process Cycle Efficiency Not revealed
Progress Stage 1 of 8
Guided learning stages
Foundation Stage 1 of 8

Current Instruction
Interactive Value Stream Dashboard

Current-State Flow, Time, WIP and Improvement Opportunity

Reveal the value stream context to begin.

100%
Mapping status: Establish the value stream context.
Supporting Analysis

Review the process data behind the map.

Activity Classification Processing Time Wait After WIP Current Interpretation
Experiment Mode

Build Your Own Value Stream Scenario

Experiment Mode is isolated from the guided demonstration. Select an activity, change its value classification, processing time, waiting time and WIP, then adjust demand and available working time.

Knowledge Check

Test value-stream-mapping judgement.

Quick Reference

Value Stream Mapping cues

Value-Added

Work that transforms the product or service in a way the customer values.

Necessary Non-Value-Added

Work that does not create customer value but is currently required by regulation, control or operating constraints.

Non-Value-Added

Work, delay or movement that creates no customer value and should be challenged for elimination.

Lead Time

Total elapsed time through the value stream: processing plus waiting and delay.

Process Cycle Efficiency

PCE = Value-Added Time ÷ Total Lead Time × 100.

Takt Time

Available Working Time ÷ Customer Demand. It is the pace required to meet demand.

Key Takeaway
Improve the flow of value—not only the speed of individual tasks.

Use the current-state map to expose waiting, WIP, rework and unnecessary handoffs; then design a future state that removes waste and shortens end-to-end lead time.