Interactive Stakeholder Engagement Demonstration

Stakeholder Power-Interest Grid

Assess stakeholder power and interest, place stakeholders on a four-quadrant grid, select an appropriate engagement approach, and reassess positions as project conditions change.

Demonstration at a glance
Level Foundation–Intermediate
Typical duration 10–15 minutes
Learning format Guided stakeholder analysis
Best for Project, programme and change professionals
Demonstration overview

Match Engagement Effort to Stakeholder Power and Interest.

A Power-Interest Grid is a simple stakeholder-analysis tool that helps a project team decide how much attention different stakeholders require. Power represents the stakeholder's ability to influence the project or its outcomes; interest represents the degree to which the stakeholder is affected by, concerned about, or actively engaged with the project.

  • Review a stakeholder register before making assumptions about influence or interest.
  • Assess power separately from interest using a consistent 1–5 scale.
  • Plot stakeholders on the grid only after both dimensions have been assessed.
  • Use the four quadrants to guide engagement effort—not to stereotype people.
  • Prioritize stakeholders within a quadrant using context, proximity, attitude and critical decisions.
  • Reassess the grid when project phases, decisions or external conditions change.
Guided Demonstration

Stakeholder Power-Interest Grid — Step by Step

Complete each locked stage before the next unlocks. Every reveal visibly changes the stakeholder dashboard.

Learning stages
Foundation Stage 1 of 8

Review the Stakeholder Register

Current instruction
Interactive Stakeholder Dashboard

Power, Interest and Engagement Strategy

Stakeholders are introduced before power and interest are assessed.

100%
Manage Closely Keep Satisfied Keep Informed Monitor

Focus Mode keeps the guided-learning pane and dashboard together while hiding surrounding page content. Dashboard Full Screen shows only the stakeholder dashboard and is also available from Focus Mode. Exiting Dashboard Full Screen returns to Focus Mode if Focus Mode was active.

Stakeholder status: Review the stakeholder register before assessing power and interest.
Supporting Stakeholder Table

Stakeholder Analysis Record

Power, interest, quadrant and engagement approach appear progressively with the guided demonstration.

Stakeholder Current Context Power Interest Quadrant Engagement Approach
Experiment Mode

Reposition a Stakeholder

Experiment Mode is isolated from the guided example. Select a stakeholder, change power and interest, and see the quadrant and engagement strategy recalculate immediately.

Quadrant
Engagement Strategy
Attention Level
Suggested Cadence
Check Your Understanding

Quick Knowledge Check

Choose an answer, then check it.
Stakeholder Power-Interest Grid Quick Reference

Quadrants and Engagement Logic

Quadrant Typical Position Default Engagement Approach Management Intent
Manage Closely High Power / High Interest Frequent two-way engagement, involve in key decisions, resolve concerns quickly Maintain active support and avoid surprises.
Keep Satisfied High Power / Low Interest Targeted executive-level updates, consult on material issues without overloading Preserve satisfaction and prevent avoidable escalation.
Keep Informed Low Power / High Interest Regular information, accessible feedback channels and involvement where useful Build understanding, advocacy and early warning.
Monitor Low Power / Low Interest Proportionate monitoring and periodic updates Use resources efficiently while watching for change.
Important: A grid position is not a label for the person. It is a current management assessment of the stakeholder's relationship to this project at this point in time. Power and interest can change by phase, issue, decision or external event.
Assess Power
Assess Interest → Plot
Engage → Reassess